We did the bathrooms two years ago and have imagined what we'd do next. Everything seemed dependent on something else and every project was going to leave us in some sort of a disarray so we decided to just do it all at once and go into the summer knowing it was going to be messy!
We complicated the project by adding on a few extra things (like canned lights in the office) and our contractor quit while working on the flooring (which, thank goodness, was the last project). We questioned ourselves many times and thought it would have been easier to just move, but in the end, the house is beautiful and completely our design.
Pictures are before (on top or on the left) and after (on bottom or on the right)...we'll for the most part!
We remodeled the kitchen, replacing the counter tops, back splash, cabinets, fixtures and flooring. We installed under cabinet lights and replaced most of the appliances.
We lowered the counter around the sink making it one flat peninsula.
We removed the dated box light above the island and added canned lights.
We relocated the microwave to make room for a double oven.
In the living room, we installed new flooring and redid the fireplace with stacked stone (we're still waiting on the new mantle).
We completely overhauled the stairs removing the carpet and replacing the treads, risers, balusters and handrails!
In our bedrooms, we replaced the flooring, and more 5" baseboards.
The foyer, formal dining and breakfast nook all got new flooring, baseboards and updated fixtures.
The office also got new flooring, canned lights and we enclosed it with French doors.
Outside we cleaned up the landscaping, added a drain system, installed sprinklers, replace the retaining brick around the flowerbeds and trees, installed a paver walkway from the driveway, to the back porch and onto the dog run, regraded the backyard and installed all new sod.
There are a couple of small things we'd still like to do, like install a new front door, but in all honesty, this house is practically brand new!